The turn-key project covers the construction of 49.4 km road section between km 372.6 and km 422 with the following work items:
-Site survey and mapping topographical survey
-Quarries and borrow areas.
-Earth works operations (1,010,046 m3)
-Production of Aggregate with different fractions (514,753 ton) -Screening and crushing operations.
-Base Course Pavement (93,172 m3)
-Cement of Sub-base (125,002 m3)
-Bituminous hot pavement operations (129,714 m3)
-Pipe and Box culvert (13 Pcs)
-Bridge repair and renovation works (42 m)
-Road Furniture and other miscellaneous works
Kazakhstan
COMPLETION DATE: 2014