The project consists of detailed engineering, procurement and implementation of all civil, mechanical, electrical and instrumentation works on a turn-key basis. The scope of the project covers the construction of new facilities and the treatment plant with a capacity of 118,000 m3 per day. The main works of the project also covers two pressure pipelines of treated waste water having 1200 mm diameter, 9 km length and 1420 mm diameter 4,3 km length as well as Electric Power Supply Networks, Communication Networks, Boiler House, Heat Networks, Water Supply Networks, Sewage Networks, Asphalt and Landscaping works.

Taldykol/ Kazakhstan

CAPACITY: 118,000 m3/day