The project consists of the engineering, procurement and construction of 4,725 m long metro system extension between 4. Levent and Ayazagˆa with 3 stations including the depot area.
The main works items of the project are as follows:
- Construction of Sanayi and Ayazagˆa stations,
- Conventional deep bored tunnel construction (NATM) 14,344 m, - Cut and cover tunnel construction 100 m,
- Viaduct construction 55 m,
- 68,000 m2 depot area.