The turn-key Project consisted of the engineering, procurement and execution of all civil, mechanical, electrical and instrumentation works of the following units: 4 boilers with a capacity of 120 tons/hour steam each, at a pressure of 100 bars and a temperature of 540°C, 2 turbo genetors with a capacity of 12 MW each, water treatment unit with a capacity of 300m3/hour.

Kırıkkale/ Turkey

CAPACITY: 4x120 tons/hour steam 2x 12 MW turbines

We are at your service to answer your requests.