The turn-key project covers the construction of 50.8 km road section between km 422 and km 472.8 with the following work items:
-Site survey and mapping topographical survey
-Quarries and borrow areas
-Earth works operations (1,024,979 m3)
-Production of Aggregate with different fractions (522,517 ton) -Screening and crushing operations
-Base Course Pavement (94,944 m3)
-Cement of Sub-base (134,263 m3)
-Bituminous hot pavement operations (131,257 m3)
-Pipe and Box culvert (21 Pcs)
-Road Furniture and other miscellaneous works
Kazakhstan
COMPLETION DATE: 2014
CLIENT: Ministry of Transport and Communications Republic of Kazakhstan