AIR PRE-HEATER SYSTEM ALI AĞA OIL REFINERY

The Project consisted of the engineering, procurement and execution of all civil, mechanical, electrical and instrumentation works of the air pre-heater system to save energy equivalent to 25.000 tons/year of fuel oil. The start- up and commissioning were also performed by Alarko Contracting Group.

İzmir/Aliağa

TASARIM: Lummus H.S.T., the Netherlands - Alarko Contracting Group (Alsim)

Taleplerinizi en kısa sürede yanıtlamak için hizmetinizdeyiz.

Alarko Taahhüt Grubu olarak, müşterilerimize ve paydaşlarımıza en iyi hizmeti sunuyoruz.